CASE STUDY |

Widnes Solar Farm

Widnes Solar Farm

We have come a long way since installing Scotland’s first ever solar farm back in 2014. In 2020, we went back to our roots and installed a 1.2MW solar farm on behalf of Halton Borough Council.

This installation went just as smoothly as the first and we look forward to continuing to lead the market in solar farm installations and a variety of other renewable energy innovations.

READ ABOUT OUR WORK WITH OUR CLIENTS

CASE STUDIES

Parkley Farm Holding Cottages